top of page
Howard Hughes Office Suites
Las Vegas
2020
Architectural & Design Team:
EV&A
CARMA completed demolition on suites 200, 300, &400 to an empty shell.
Suite 590 included demolition and build out for spec space.
Anchor 1
bottom of page
Las Vegas
2020
EV&A
CARMA completed demolition on suites 200, 300, &400 to an empty shell.
Suite 590 included demolition and build out for spec space.