top of page
Terrazzo Mandalay Bay
Mandalay Bay
2022
Architectural & Design Team:
An intricately phased project that required extreme "out-of-the-box," solution-orientated thinking. A total of 31,000 SF of existing concrete flooring was removed and new terrazzo flooring was installed on the casino/ convention way floor area.
Anchor 1
bottom of page